Latest update on road - due to weak soil conditions behind the ICTC building, part of the road will not be constructed.
Showing posts with label ICTC. Show all posts
Showing posts with label ICTC. Show all posts
The project include widening of the road near to the water tank which then link to the back of new ICTC building, pass the PAPHRSB Institute of Health Science and straight on to the entrance road to the neighbouring Institute Teknologi Brunei. Construction work in progress.
Current physical progress 66.6%
The first site meeting for 2010 was held today at the Site Office with a brand new project architect in charge. The meeting as usual was attended by all consultants, suppliers, main contractor and us (Estate Office).
External works: Drainage 95% completed, walkway hand railing completed and walkway roof sheet installation in progress
Internal building work: Completed are all the truss work, door frame fixings and railing work. In progress are tile work, wall partition, ceiling work, internal plumbing work.
Special thanks to the building material suppliers for their support and cooperation.
Transportation to and from the site courtesy of the new vintage 4WD of the Estate Office. And to end the post, enjoy the pictures showing the view from the new building - the blue sea can be seen even from the first floor.
The new ICTC Building is located next to the Institute of Medicine. It is due for completion in March 2010 and will house the Language Centre, Educational Technology Centre and the Information, Communication Technology Centre.
Overall progress: 60%
The ICTC is located within the Academic Services Building which also house the Library and the Educational Technology Centre. By 2010, with the completion of the new Academic Services Building, the space currently occupied by ICTC will be converted to Library space.